Cold / base shell
- Livio Cloud delivers
- Envelope only: slab, walls, roof, utility stub to property line.
- Tenant delivers
- All MEP, white-space fit-out, racks, and IT.
CloudNNN lease · Rack-ready white space · Bring your own racks
Fully rack-ready AI data center white space on a long-term triple-net (NNN) lease — rack-ready in about six months for most projects, even at 50 MW; larger campuses (100 MW to 1 GW+) run nine to twelve months. Power and liquid cooling delivered to every rack position. You bring the racks and IT; we deliver everything up to the busway tap-off.
Choose your path
Share acreage, site control, power, fiber, and documents so Livio Cloud can review the opportunity.
Start land submissionOfftakersRequest rack-ready AI capacityCreate a secure buyer account, sign the light MNDA, and submit region, MW, rack, cooling, and timing needs.
Start capacity requestWhy rack-ready space is the bottleneck
The product
Livio Cloud is vertically integrated: we source powered land, engineer the campus with the Livio Grid design engine, erect it with the Livio Smart Shell building system, and deliver it turnkey through our EPC practice. One counterparty, one lease.
Livio Cloud is not raw land, a base building, or a utility-only building. It is a turnkey rack-ready data center delivery offering: Livio designs, prices, builds, commissions, and leases the facility infrastructure that makes tenant rack deployment possible.
The tenant keeps control of platform-specific rack choices, in-rack power and liquid-cooling hardware, IT equipment, software, telecom, and operations. That separation is what lets hyperscalers and GPU cloud operators use their own standards without inheriting facility delivery risk.
Scope tier
Contract boundary
Power and cooling are delivered to each rack position.
Racks roll in and connect to the facility-side interfaces.
Livio Cloud vs tenant
Built for the buyers behind the GPU boom
What customers configure
Common questions
No. Livio Cloud is real estate: fully rack-ready white space on a long-term NNN lease. You own and operate your hardware; we deliver and own the facility. If you're looking to rent GPUs by the hour, we're not that — and we're happy to say so up front.
Triple-net: you pay rent plus the facility's operating pass-throughs (utilities, taxes, insurance), which means you control your operating costs directly. Livio carries delivery: the ready-for-service date is committed in the lease.
Capacity is site-specific and offered as each site reaches control and pre-lease stage — we don't market space we don't control. Tell us your MW, region, and timeline and we'll tell you exactly what we can commit to and when.
Livio does, end to end: the campus is engineered by the Livio Grid design engine, erected with the Livio Smart Shell panelized building system, and delivered by our EPC practice. Single counterparty, single point of accountability.
Yes — actively: powered parcels, interconnection queue positions, and entitled sites. If you hold one, start at the landowner page.
Talk to us
One call. We'll tell you what we can commit to, where, and when — and put the ready-for-service date in the lease.
Landowners bring sites. Offtakers bring demand. Livio Cloud matches credible land, power, fiber, financing, and rack-ready facility delivery.
Best for owners, brokers, and developers with land, power evidence, fiber evidence, or site-control documents.
Open land submissionFor offtakersFind rack-ready capacityBest for AI labs, GPU cloud operators, hyperscaler teams, and capital partners looking for deployable capacity.
Open capacity request